National Wind Watch Picture Gallery

833 files in 3 albums with 0 comments viewed 804,935 times
Photos


San-Gorgonio-Pass-Bill-Clark.jpg

709 files, last one added on Jun 02, 2018
Album viewed 12197 times

Graphics


storage-denmark-chart.gif

120 files, last one added on Apr 04, 2018
Album viewed 8371 times

Videos


Bocholt-15yo-turbine-pulled-down.avi

4 files, last one added on Nov 21, 2013
Album viewed 783 times

 

3 albums on 1 page(s)

Latest additions
San-Gorgonio-Pass-Bill-Clark.jpg
San Gorgonio Pass near Banning, CaliforniaSan Gorgonio Pass near Banning, California - photo by Bill Clark/Roll Call, via Getty ImagesJun 02, 2018
storage-denmark-chart.gif
Low winds over 10 days show limitation of storage‘The wind energy deficit — relative to its annual average — over the ten-day period was 246GWh. That is nearly 30 times the capacity of the largest pumped storage hydro facility in the UK and would cost about $37 billion, assuming suitable sites could be found.’ —Windpower Monthly, 22 March 2018Apr 04, 2018
Vestas-turbine-burning.jpg
FireFireApr 04, 2018
windrad-defekt.jpg
No Entry: Defective Wind TurbinePhoto by Polizei NienburgMar 10, 2018

Random files
Ontario-Chatham-Kent-International-Power-GDF-Suez-from-Shrewsbury-4.jpg
Chatham-Kent, OntarioChatham-Kent, Ontario - photo by David Libby
storage-denmark-chart.gif
Low winds over 10 days show limitation of storage‘The wind energy deficit — relative to its annual average — over the ten-day period was 246GWh. That is nearly 30 times the capacity of the largest pumped storage hydro facility in the UK and would cost about $37 billion, assuming suitable sites could be found.’ —Windpower Monthly, 22 March 2018
NH-Granite-Reliable-new-pad.png
Granite Reliable, New HampshireThe concrete pad for a new turbine sits to the upper left in this view, which shows how it all begins. Land-clearing operations are underway, with groundwork being completed by Sargent Corporation of Stillwater, Maine. Associated support companies also include JML Trucking of Errol and C. Bean Transport of Colebrook. As of July, there were 168 workers on site. (Claire Lynch photo, The News and Sentinel)
wind_turbine_foundation.jpg
Wind turbine foundationWind turbine foundation
IL-Mike-Doyle.jpg
Arrowsmith, Ill.Central Illinois grain farmer Mike Doyle walks across a snow-covered field full of wind turbines on his farm in Arrowsmith - Seth Perlman, AP
Nordex-hill.jpg
Nordex wind turbines on hillsNordex wind turbines on hills
HowGreenWasMyTurbineWEB.jpg
How Green Was My TurbineAnother poem/cartoon (about “green tags”) from beat poodle Fred Milton, graciously provided by Lynda Barry
UMinn25.jpg
Base of wind turbine foundation: concrete and steelUniversity of Minnesota Outreach, Research and Education Park, 2011 - the base of the foundation is 10 feet deep and 60 feet in diameter, the foundation consists of 40 tons of steel rebar

Get the Facts Follow Wind Watch on Twitter

Wind Watch on Facebook

Share

CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.
Share

Wind Watch on Facebook

Follow Wind Watch on Twitter